23/01177/CDM
|
Condition Discharge: Conditions 4, 5 (partial) & 6 (partial) of application 20/00783/FUL
|
680 Wolseley Road Plymouth PL5 1JL


Collapse All|Expand All
Public Protection Service
Consultation Date: Fri 25 Aug 2023
Network Rail
Consultation Date: Fri 25 Aug 2023
Highway Authority
Comment Date: Wed 04 Oct 2023
On the basis of the revised Enabling Works and Method Statement document that has been submitted, I can confirm that the LHA would wish to raise no objections to the partial discharge of condition 5 (CEMP).Comment Date: Wed 06 Sep 2023
My comments are limited to the details submitted for the partial discharge of condition 5 (CEMP).The wording of condition 5 clearly refers to details being submitted showing the location of the site access for construction traffic and ensuring adequate visibility is provided. However the plan provided merely shows Heras fencing being provided along the entire length of the site and as such it is difficult to comment on the safety of the position of the site access as it could be anywhere along the length of the site. This needs to be clarified.
Furthermore, the plan also refers to a grab tipper lorry being used to remove material from the site. As this is likely to require such a vehicle being parked on the public highway for a period of time, the applicant would have to secure the necessary permits from our Street Services Department. This would include details of any Traffic Management measures required.
Until these points are addressed I am unable to recommend the partial discharge of condition 5.
Lead Local Flood Authority
Comment Date: Fri 15 Sep 2023
LLFA consultation response 23.01177.CDM.pdf