24/00164/FUL | Replace existing lighting columns at the south and west boundaries with lower height and lower lux level bollard fittings; and the addition of a 1m high metal shroud to the west boundary fence. | Stonehouse Barracks, Durnford Street Plymouth PL1 3QS
  • Print summary icon
  • Total Consulted: 4
  • Consultees Responded: 4
  • View all comments icon

Search Filters

Collapse All|Expand All

Historic Environment

Comment Date: Wed 20 Mar 2024

The proposed development is for the replacement of existing light columns within the RM Stonehouse Barracks, specifically within the southern half of the military site and surrounding the Eastern Kings Battery Scheduled Ancient Monument (NHL - 1002643).

Historic Environment have no in principle objections to the proposed development which is largely a like for like replacement of existing lighting columns for lighting columns that are of a lower height and reduced lux levels.
There appears to be no development within the boundary of the SAM, therefore any harm would be limited to visual impact on the setting of the designated heritage asset. Given the like for like nature of the replacement we consider the impact and harm on the setting and significance of the Eastern Kings Battery to be negligible. The reduced lux levels proposed may even be an improvement. As such the development is considered compliant with DEV21 of The Plymouth and South West Devon Joint Local Plan and NPPF guidance (Dec 2023). We have no recommended conditions and our recommendation is that the development is acceptable from a Historic Environment perspective.

Public Protection Service

Comment Date: Thu 14 Mar 2024

FROM: Becky Curtis, Public Protection Service -949802

RESPONSE DATE:14.03.2024

APPLICATION NO:24/00164/FUL

SITE: Stonehouse Barracks, Durnford Street Plymouth PL1 3QS

DEVELOPMENT: Replace existing lighting columns at the south and west
boundaries with lower height and lower lux level bollard fittings; and the addition of a 1m high metal shroud to the west boundary fence.

Summary of response: Approval - no comments


Historic England

Comment Date: Tue 05 Mar 2024

Decision not to comment.

Natural Infrastructure Team

Comment Date: Wed 28 Feb 2024

The Natural Infrastructure Planning Team hold no objections to this development.

Please use the new Plymouth and South West Devon Joint Local Plan Supplementary Planning Document, Adopted July 2020 or if you require further guidance please contact niplanning@plymouth.gov.uk to arrange an NI planning surgery slot.

If this application involves additional bedrooms, please complete a HRA02 Assessment. If the application may have a direct impact to the European Marine Site (a full assessment HRA01), please consult the team through an HRA consultation.

Kind regards

Natural Infrastructure Planning Team

Powered by Idox