25/00748/FUL
|
New plant and ventilation to rear of store. New external lighting, di-bond panels, trolley bay rails and armco barrier
|
98 Glen Road Plympton Plymouth PL7 2XS


Collapse All|Expand All
Environmental Health & Licensing
Consultation Date: Fri 25 Jul 2025
Environmental Health & Licensing
Consultation Date: Thu 12 Jun 2025
Environmental Health & Licensing
Consultation Date: Thu 24 Jul 2025
Natural Infrastructure Team
Comment Date: Mon 23 Jun 2025
The Natural Infrastructure Planning Team hold no objections to this development. However, we recommend that the following informative is applied:Informative: Bats and Breeding Birds (Habitat)
The proposed works may take place within a site with suitability for bats or breeding birds. Under the Wildlife and Countryside Act (1981), bats and breeding birds are legally protected against disturbance, injury or killing and bat roosts are protected against obstruction, damage or destruction. If bats or a bat roost is present in the building, a licence to carry out the works from Natural England may be required. Please note bats are incredibly sensitive, so any alterations to buildings including roof lining, timber treatment, tile replacement will need consideration. In practice, if any protected species are found on site (such as nesting birds, bats or reptiles) works must cease immediately, and a suitably qualified Ecologist consulted; therefore, close inspection of the site's habitat should be undertaken prior to the commencement of works to determine if any bats or birds reside in the trees. No works should occur while birds are nesting which may be at any time between the month of March to September inclusive; if bats are present works should cease until the applicant has obtained further advice from Natural England.
Please use the new Plymouth and South West Devon Joint Local Plan Supplementary Planning Document, Adopted July 2020 or if you require further guidance please contact niplanning@plymouth.gov.uk to arrange an NI planning surgery slot.
If this application involves additional bedrooms, please complete a HRA02 Assessment. If the application may have a direct impact to the European Marine Site (a full assessment HRA01), please consult the team through an HRA consultation.
Kind regards
Natural Infrastructure Planning Team
Highway Authority
Comment Date: Mon 16 Jun 2025
There are no objections to this application from a LHA viewpoint.