25/00821/CDM
|
Condition Discharge Condition 5 (Landscape Design Proposals) of application 19/00675/S73. Change of surfacing material to the Reservoir car park to a reinforced gravel
|
Melville Building Royal William Yard Plymouth PL1 3RP


Collapse All|Expand All
Urban Design
Consultation Date: Fri 13 Jun 2025
Urban Design
Consultation Date: Fri 25 Jul 2025
Lead Local Flood Authority
Consultation Date: Fri 13 Jun 2025
Highway Authority
Comment Date: Mon 23 Jun 2025
Plymouth City CouncilStrategic Planning & Infrastructure
Transport Planning Team
Ext: 01752 307813
Date: 23rd June 2025
Katie Graham
Development Management
Strategic Planning & Infrastructure
Floor 2
Ballard House
Dear Katie
Highway Authority Consultation Response to a Planning Application
APPLICATION NO: 25/00821/CDM
SITE: MELVILLE BUILDING, ROYAL WILLIAM YARD, PLYMOUTH
DEVELOPMENT: Condition Discharge Condition 5 (Landscape Design Proposals) of planning application 19/00675/S73. Change of surfacing material to the Reservoir car park to a reinforced gravel
Observations:
Whilst the LHA would not wish to raise any in-principle objections to the changes to the surface of the reservoir overflow car park, the likelihood of gravel getting caught in the tyres of vehicles and being deposited elsewhere within the site (such as on the ramp down into the reservoir) remains a concern. However, it is accepted that this is a matter for the applicant to control/manage as it would not impact upon the public highway.
It is noted that white plastic inserts are proposed for the demarcation of individual parking spaces. The only concern regarding such would be the possibility of these inserts becoming covered by loose gravel as vehicles turn int and out of the spaces.
I would also add that a dropped kerb would be required on the concrete island at the bottom of the pedestrian route which runs alongside the ramp into the reservoir area.
Recommendation:
The Highway Authority have no objections to Condition 5 being discharged.
Scott Smy
Transport Development Coordinator
Officer authorised to sign on behalf of the Service
Director for Strategic Planning & Infrastructure